3 Fires in 2 Days |
| By Chief Kevin Roberson | |
| April 5, 2010 | |
| At 0848 hours Co.7 was requested for Mutual Aid to King George for the house fire at 7246 Goby Ln. Tanker 7 went out the door. First arriving units where met with heavy fire conditions. The tanker went on the scene and went to work shuttling water until the fire was under control. At 1412 hours the tones dropped for a tanker task force for the house fire at 317 Norman Rd. in Wide Water Co.3s first due. Do to the amount of personnel on the scene the tanker was used for water supply operations. At 1435 April 6th the E.C.C. Dispatched Co.7 for the house fire at 100 Boundary Dr. in Co.8s first due. Out the door went the Engine and Tanker with 4 personnel. Due to the amount of apparatus on the scene the Engine was to transfer to co.14 for the fill in. Once on the scene the tanker was utilized for water supply operations again. After about 2 hours the Engine was asked to transfer to station 9. Engine 7 returned home 4 hours later |
|
| Units: | K7, CH1, E1 |